Michigan Central Railroad Hoodie / Sweatshirt

Michigan Central Railroad Hoodie / Sweatshirt

S / Dark Heather
$39.99
Skip to product information
Michigan Central Railroad Hoodie / Sweatshirt
Fit

Michigan Central Railroad Hoodie / Sweatshirt

$39.99
ColorDark Heather
Size

Secure checkout — pay your way

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • MB WAY
  • Satispay
  • Shop Pay
  • Visa
  • PayPal
  • venmo

Product Details & Size Guide

GhostCorp Apparel - resurrecting iconic corporate ghosts.

Show your appreciation for Michigan Central Railroad and the routes that connected Detroit with towns across the Great Lakes region and onward to Chicago. Chartered in 1832, the line reached Lake Michigan in 1849 and later carried passenger trains such as the Wolverine alongside timber and automobile-related freight. Its story also reflects the changing ownership of American railroads over time. A meaningful choice for casual wear, rail gatherings, or a present for someone interested in Michigan, Detroit, and railroad history.

Michigan Central Railroad was chartered in 1832 to establish rail service between Detroit and St. Joseph, Michigan. Its predecessor, the Detroit and St. Joseph Railroad, began construction in Detroit in 1836. After state ownership and financial difficulties, the railroad was sold in 1846 to the newly incorporated Michigan Central corporation. The line reached Lake Michigan in 1849 and was extended through Indiana to the Chicago area by 1852. The railroad later operated in Michigan, Indiana, Illinois, and Ontario. From about 1867 it was controlled by the New York Central Railroad. Its passenger trains included the Wolverine, and its routes carried timber, automobiles, and auto-related freight. New York Central became part of Penn Central in 1968, followed by Conrail. In 1995, Michigan Central was merged into United Railroad Corp., a Penn Central subsidiary. After the 1998 Conrail breakup, Norfolk Southern owned much of the former Michigan Central trackage. Amtrak continues to use portions of the former route between Chicago and Detroit.

S M L XL 2XL 3XL 4XL 5XL
Width, in 20.08 22.05 24.02 25.98 27.99 29.92 31.89 33.86
Length, in 27.17 27.95 29.13 29.92 31.10 31.89 33.07 33.86
Sleeve length from center back, in 33.50 34.50 35.50 36.50 37.50 38.50 39.50 40.50
Size tolerance, in 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

Product features

- 50/50 cotton-poly mid-weight (8.0 oz) for warmth and soft handfeel

- Tubular knit (no side seams) for cleaner lines and less waste

- Double-lined hood with color-matched drawcord and tear-away label

- Kangaroo pouch pocket for hand warmth and storage

- DTF/DTG printing and optional embroidery placements (chest, wrists) for durable graphic detail

Care instructions

- Tumble dry: medium

- Iron, steam or dry: low heat

- Do not dryclean

- Machine wash: cold (max 30C or 90F)

- Non-chlorine: bleach as needed



EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Gildan 18500, two year warranty in the EU and Northern Ireland

Warnings, Hazard: For adults

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: medium, Iron, steam or dry: low heat, Do not dryclean

You may also like