Wabash Pittsburgh Terminal Railway Heavy Knit Quarter-Zip Sweatshirt

Wabash Pittsburgh Terminal Railway Heavy Knit Quarter-Zip Sweatshirt

XS / Deep Black
$59.99
Skip to product information
Wabash Pittsburgh Terminal Railway Heavy Knit Quarter-Zip Sweatshirt
Fit

Wabash Pittsburgh Terminal Railway Heavy Knit Quarter-Zip Sweatshirt

$59.99
ColorDeep Black
Size

Secure checkout — pay your way

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • MB WAY
  • Satispay
  • Shop Pay
  • Visa
  • PayPal
  • venmo

Product Details & Size Guide

GhostCorp Apparel - resurrecting iconic corporate ghosts.

Celebrate a distinctive chapter of Pittsburgh rail history in this heavy knit quarter-zip sweatshirt. Work on the Wabash Pittsburgh Terminal Railway began in 1901, and passenger service reached its downtown terminal in 1904. The railway later reorganized as the Pittsburgh and West Virginia Railway, whose 1931 extension to Connellsville helped connect routes associated with the Alphabet Route. Its changing identity reflects the evolution of rail networks across Pennsylvania, Ohio, and West Virginia. A considered choice for railfans and collectors drawn to historic railroad names.

The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.

XS S M L XL 2XL 3XL 4XL
Width, in 18.50 20.00 21.50 23.00 25.00 27.00 29.50 32.50
Length, in 25.50 26.50 27.50 28.50 29.50 30.50 31.25 32.00
Sleeve length (from center back), in 33.75 34.50 35.50 36.00 36.75 37.50 38.25 39.00
Size tolerance, in 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Product features

- 55% cotton / 42% polyester / 3% spandex midweight blend

- Odor-resistant performance fabric

- Silver metal quarter-zip with metal pull

- Self-banded cuffs and hem for structured fit

- Medium-heavy fabric (9.73 oz/yd²) with subtle stretch

Care instructions

- Machine wash: cold (max 30C or 90F)

- Non-chlorine: bleach as needed

- Tumble dry: low heat

- Iron, team or dry: medium heat

- Do not dryclean

EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Mercer+Mettle™ MM3040, 2 year warranty in EU and Northern Ireland as per Directive 1999/44/EC

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: low heat, Iron, team or dry: medium heat, Do not dryclean



EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Mercer+Mettle™ MM3040, two year warranty in the EU and Northern Ireland

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: low heat, Iron, team or dry: medium heat, Do not dryclean

You may also like