Wabash Pittsburgh Terminal Railway Hoodie / Sweatshirt

Wabash Pittsburgh Terminal Railway Hoodie / Sweatshirt

S / Dark Heather
$39.99
Skip to product information
Wabash Pittsburgh Terminal Railway Hoodie / Sweatshirt
Fit

Wabash Pittsburgh Terminal Railway Hoodie / Sweatshirt

$39.99
ColorDark Heather
Size

Secure checkout — pay your way

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • MB WAY
  • Satispay
  • Shop Pay
  • Visa
  • PayPal
  • venmo

Product Details & Size Guide

GhostCorp Apparel - resurrecting iconic corporate ghosts.

Show your interest in Pittsburgh rail heritage with this hoodie / sweatshirt celebrating the Wabash Pittsburgh Terminal Railway. Built as an extension of a wider railroad system, the line began construction in 1901 and opened passenger service into Pittsburgh in 1904. Its successor, the Pittsburgh and West Virginia Railway, later extended to Connellsville, helping connect routes associated with the Alphabet Route. The company’s story spans ambition, reorganization, and changing rail connections, making this a meaningful choice for train enthusiasts and collectors of regional railroad history.

The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.

S M L XL 2XL 3XL 4XL 5XL
Width, in 20.08 22.05 24.02 25.98 27.99 29.92 31.89 33.86
Length, in 27.17 27.95 29.13 29.92 31.10 31.89 33.07 33.86
Sleeve length from center back, in 33.50 34.50 35.50 36.50 37.50 38.50 39.50 40.50
Size tolerance, in 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

Product features

- 50/50 cotton-poly mid-weight (8.0 oz) for warmth and soft handfeel

- Tubular knit (no side seams) for cleaner lines and less waste

- Double-lined hood with color-matched drawcord and tear-away label

- Kangaroo pouch pocket for hand warmth and storage

- DTF/DTG printing and optional embroidery placements (chest, wrists) for durable graphic detail

Care instructions

- Tumble dry: medium

- Iron, steam or dry: low heat

- Do not dryclean

- Machine wash: cold (max 30C or 90F)

- Non-chlorine: bleach as needed



EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Gildan 18500, two year warranty in the EU and Northern Ireland

Warnings, Hazard: For adults

Care instructions: Machine wash: cold (max 30C or 90F), Non-chlorine: bleach as needed, Tumble dry: medium, Iron, steam or dry: low heat, Do not dryclean

You may also like