Wabash Pittsburgh Terminal Railway Spiral Notebook

Wabash Pittsburgh Terminal Railway Spiral Notebook

One Size
$19.99
Skip to product information
Wabash Pittsburgh Terminal Railway Spiral Notebook
Fit

Wabash Pittsburgh Terminal Railway Spiral Notebook

$19.99
SizeOne Size

Secure checkout — pay your way

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • MB WAY
  • Satispay
  • Shop Pay
  • Visa
  • PayPal
  • venmo

Product Details & Size Guide

GhostCorp Apparel - resurrecting iconic corporate ghosts.

Keep notes, plans, and rail history interests together with a notebook inspired by the Wabash Pittsburgh Terminal Railway. Construction began in 1901, and passenger service into Pittsburgh followed in 1904. The railroad's story includes a downtown terminal, a river bridge, receivership, and reorganization as the Pittsburgh and West Virginia Railway. Its later connection with the Alphabet Route adds another chapter for collectors and railfans. This notebook is a practical companion for research, journaling, or recording visits to historic railroad places.

The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.

One Size
Height, in 8.00
Length, in 6.00
Thickness, in 0.60

Product features

- 118 ruled pages (59 sheets) of smooth 90gsm paper for clear, bleed-resistant writing

- 350gsm front and back covers with a printed front and dark grey back for durability

- Metal spiral binding that lays flat and allows easy page removal

- Interior document pocket on back cover for storing receipts, maps, or notes

- Compact size: 6" x 8" (15.2 x 20.3 cm) — portable and ride-ready

Care instructions

- Use a soft, clean and dry cloth to gently brush any dust or dirt off from the center of book outwards.



EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Generic brand, two year warranty in the EU and Northern Ireland

Care instructions: Use a soft, clean and dry cloth to gently brush any dust or dirt off from the center of book outwards.

You may also like