Wabash Pittsburgh Terminal Railway Unisex Quarter Zip Pullover

Wabash Pittsburgh Terminal Railway Unisex Quarter Zip Pullover

XS / White
$39.99
Skip to product information
Wabash Pittsburgh Terminal Railway Unisex Quarter Zip Pullover
Fit

Wabash Pittsburgh Terminal Railway Unisex Quarter Zip Pullover

$39.99
ColorWhite
Size

Secure checkout — pay your way

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • MB WAY
  • Satispay
  • Shop Pay
  • Visa
  • PayPal
  • venmo

Product Details & Size Guide

GhostCorp Apparel - resurrecting iconic corporate ghosts.

Carry a piece of Pittsburgh rail history into everyday wear with this Wabash Pittsburgh Terminal Railway quarter zip pullover. The railway began as an ambitious extension of George J. Gould's network, bringing passenger service into Pittsburgh in 1904. Its story continued through reorganization as the Pittsburgh and West Virginia Railway and a place in the Alphabet Route. A thoughtful pick for rail enthusiasts, regional history fans, and anyone drawn to the changing lines that connected Pennsylvania, Ohio, and West Virginia.

The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.

XS S M L XL 2XL 3XL 4XL
Width, in 19.00 20.50 22.00 23.50 25.00 26.50 28.50 30.50
Length, in 27.00 28.00 29.00 30.00 31.00 32.00 32.50 33.00
Sleeve length, in 34.20 35.00 35.75 36.50 37.25 38.00 38.75 39.50

Product features

- 100% polyester — lightweight and quick-drying (3.8 oz/yd²)

- Moisture-wicking fabric that moves sweat away from skin

- Cadet collar with reverse-coil plastic zipper and metal head

- Direct-to-Film (DTF) chest print for crisp, durable graphics

- Regular fit with tear-away label for comfortable, irritation-free wear

Care instructions

- Machine wash: cold (max 30C or 90F)

- Do not bleach

- Do not tumble dry

- Do not iron

- Do not dryclean



EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY

Product information: Sport-Tek ST357, two year warranty in the EU and Northern Ireland

Care instructions: Machine wash: cold (max 30C or 90F), Do not bleach, Do not tumble dry, Do not iron, Do not dryclean

You may also like