Product Details & Size Guide
GhostCorp Apparel - resurrecting iconic corporate ghosts.
Add Pittsburgh railway history to a relaxed gathering with this Wabash Pittsburgh Terminal Railway can cooler. The line's story began with construction in 1901 and passenger service to its downtown terminal in 1904, connecting the city to a wider network of destinations. Reorganized as the Pittsburgh and West Virginia Railway after a foreclosure sale, it later helped shape the Alphabet Route story. A fitting pick for rail fans, collectors, and anyone drawn to the history of changing routes across the region.
The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.
Add Pittsburgh railway history to a relaxed gathering with this Wabash Pittsburgh Terminal Railway can cooler. The line's story began with construction in 1901 and passenger service to its downtown terminal in 1904, connecting the city to a wider network of destinations. Reorganized as the Pittsburgh and West Virginia Railway after a foreclosure sale, it later helped shape the Alphabet Route story. A fitting pick for rail fans, collectors, and anyone drawn to the history of changing routes across the region.
The Wabash Pittsburgh Terminal Railway was built as a Pittsburgh extension of George J. Gould's Wabash Railroad system. Work began in 1901, and the company was formed in 1904 by consolidating three chartered railroads and transferring related properties. Passenger service into Pittsburgh's Wabash Terminal began in 1904, with through trains to Toledo, Chicago, St. Louis, and Kansas City. The railway entered receivership in 1908; after a foreclosure sale in 1916, it was reorganized as the Pittsburgh and West Virginia Railway. In 1931, an extension opened to Connellsville, Pennsylvania, connecting with the Western Maryland Railway through other rail lines and helping form the Alphabet Route. The Norfolk and Western Railway leased the P&WV in 1964. In 1990, the lease transferred to a new Wheeling and Lake Erie Railway after Norfolk Southern spun off much of the former W&LE. The original Pittsburgh terminal was damaged by fires in 1946 and demolished in 1953; the Wabash Bridge was removed in 1948.
| Regular Can | Slim Can | |
| Height, in | 4.30 | 6.00 |
| Diameter, in | 3.50 | 3.50 |
Product features
- Durable 100% polyester exterior with edge-to-edge vibrant print
- Soft 100% foam liner for firm grip and insulation
- Lightweight and slim — fits regular and slim cans
- Outside white polyester with black foam interior for contrast
- Available sizes: Regular (3.5" x 4.3") and Slim (3.5" x 6'")
Care instructions
- Wipe with a damp cloth, air dry or use a soft, non-abrasive cloth
EU representative: HONSON VENTURES LIMITED, gpsr@honsonventures.com, 3, Gnaftis House flat 102, Limassol, Mesa Geitonia, 4003, CY
Product information: Generic brand, two year warranty in the EU and Northern Ireland
Care instructions: Wipe with a damp cloth, air dry or use a soft, non-abrasive cloth